General Assist Technical Reference

Wall-Mounted Split Installation Guide

ASTG18KMCA / ASTG22KMCA / ASTG24KMCA
For AOTG18KMCA / AOTG22KMCA / AOTG24KMCA R32 outdoor units
R32 flammable refrigerant: Installation and refrigerant work must be completed by appropriately qualified personnel using R32/R410A-rated tools. Remove ignition sources, maintain ventilation and use a suitable R32 leak detector.
Important - flareless indoor joint: The indoor unit does not use a conventional flare connection. It uses a factory-fitted flareless joint nut assembly. Follow the insertion-mark and tightening procedure in this guide. If the assembly is loosened after being fully tightened, it must be replaced with a new flareless joint nut assembly.
Minimum room area: Install, operate and store the indoor unit in a room with a floor area greater than 2.06 m². Mechanical connections must remain accessible for maintenance.

1. Quick specifications

ItemRequirement
RefrigerantR32
Liquid pipe6.35 mm (1/4 in), 0.8 mm wall thickness
Gas pipe12.70 mm (1/2 in), 0.8 mm wall thickness
Maximum pipe length30 m
Maximum height difference20 m
Factory charge allowanceUp to 20 m
Additional charge20 g/m above 20 m; +100 g at 25 m and +200 g at 30 m
Maximum charge1,470 g
Cooling range-10°C to 46°C
Heating range-15°C to 24°C
Power cable - model 182.5 mm², 2 conductors plus earth
Power cable - models 22/244.0 mm², 2 conductors plus earth
Interconnection cable1.5-2.5 mm², 3 conductors plus earth
Breaker16 A model 18; 20 A models 22/24; 30 mA earth leakage protection

2. Indoor-unit installation

ClearanceMinimum
Above unit84 mm
Left side127 mm
Right side133 mm
Front1,500 mm
Floor to unit1,800 mm
Remote rangeMaximum 7 m
Human sensor: Approximate detection range is 7 m, 90° vertically and 100° horizontally.

Six piping directions

Rear, right, bottom, left-bottom, left and left-rear.
  1. Mount the wall bracket level using at least five screws.
  2. Cut a 65 mm wall hole with the outside edge 5-10 mm lower.
  3. Always install a wall pipe and wall cap.
  4. For left-side piping, transfer the drain hose and drain cap and refit the retaining screw.
  5. Keep the drain hose below the refrigerant pipes and maintain continuous fall.
  6. Engage the top hooks first, then press the lower fittings onto the bottom hooks.
Drainage: Do not lift the drain hose, create waves or submerge the end. Apply freeze protection where the hose may be exposed below 0°C.

3. Indoor flareless joint connection

Use clean, straight pipe ends. Do not use pipe with scratches, dents, deformation or bends within 30 mm of the pipe end. Cut square and deburr carefully.
PipeInsertion mark from pipe endTightening torque
6.35 mm22 mm16-18 N·m
12.70 mm27 mm49-61 N·m
1Mark the insertion depth on the connection pipe: 22 mm for 1/4 in and 27 mm for 1/2 in.
2Peel the seal from the tightening nut.
3Insert the pipe until it contacts the indoor-unit joint. If required, loosen the tightening nut by half a turn only to permit insertion.
4Hand-tighten the nut to temporarily secure the pipe.
5Hold the indoor body-side coupling with a spanner and tighten the hexagonal nut with a torque wrench.
6Confirm the insertion mark is within 1 mm of the tightening nut.
Reject and replace: If the insertion mark is more than 1 mm from the nut, remove and replace the flareless joint nut assembly and repeat the procedure. If the assembly has been loosened after final tightening, it must also be replaced.

4. Outdoor-unit installation

SideMinimum
Rear100 mm
Left100 mm
Right250 mm
Front200 mm
Above600 mm
Below50 mm
  • Mount on a strong stand and do not install directly on the ground.
  • Keep the unit within 5° of level and secure against strong wind.
  • Keep at least three horizontal directions open where possible.
  • Do not use the drain pipe or drain caps where outdoor temperature may be 0°C or lower.
  • Raise the unit and provide snow protection in heavy-snow areas.

5. Outdoor flare connections

PipeTorque
6.35 mm16-18 N·m
12.70 mm49-61 N·m
Use R32/R410A-compatible tools. Bend pipes at a radius of at least 70 mm and do not bend the same location more than three times.

6. Evacuation and charging

Do not purge with refrigerant. Use a clean R32/R410A vacuum pump and manifold.
  1. Confirm the service valves are fully closed.
  2. Connect the manifold to the 3-way-valve charging port.
  3. Evacuate for at least 15 minutes and achieve -0.1 MPa / -76 cmHg.
  4. Close the low-side valve and stop the vacuum pump.
  5. Crack the 3-way valve until pressure reaches approximately 0.1-0.2 MPa, then disconnect the hose.
  6. Fully open both service valves.
  7. For pipework above 20 m, add liquid R32 by electronic scale at 20 g/m.
  8. Leak-test all refrigerant joints before commissioning.
CapTorque
1/4 in blank cap20-25 N·m
1/2 in blank cap28-32 N·m
Charging-port cap12.5-16 N·m

7. Electrical wiring

Match terminals 1, 2 and 3 between indoor and outdoor units and connect protective earth. Clamp cables by the outer sheath.
ScrewTorque
M3.50.8-1.0 N·m
M41.2-1.8 N·m
M52.0-3.0 N·m
Route demand-control wiring away from power and interconnection cables to prevent electrical noise and malfunction.

8. Test run and commissioning

Hold MANUAL AUTO for more than 10 seconds to begin forced cooling. The OPERATION and TIMER lamps flash together. Select HEAT on the remote for a heating test. End using START/STOP.
Commissioning checkDone
Indoor flareless insertion marks within 1 mm of nuts
Outdoor flare joints leak-tested
Drainage test completed
Remote, lamps and louvres operate correctly
No abnormal noise or vibration
Additional charge recorded where applicable
Customer shown operation and filter maintenance

9. Optional controls

OptionReference
Wired remote controllerUTY-RVNYN / UTY-RNNYN; UTY-TWBXF1 communication kit required
Simple remote controllerUTY-RSNYN; communication kit required
External connect kitUTY-XWZXZ5
Communication kitUTY-TWBXF1
Based on Fujitsu General indoor installation manual Part No. 9320456009 and outdoor installation manual Part No. 9320394004-02. This simplified field reference does not replace the complete manuals, rating labels or current Australian and New Zealand regulations.